Geotechnical consultants for Main Contractor for a Housing
Development Board basement project at Sembawang N4 C9
Picture 1: N/A
(Click on images to see larger version)
Geotechnical consultants for Main Contractor for Housing
Development Board basement project at Sembawang N4 C9
Picture 1: Sheet piles with
strutting
Picture 2: CBP wall
(Click on images to see larger version)
Geotechnical consultants for foundation and basement
excavation for an industrial building at Paya Lebar
Rd/Ubi Ave 3
Picture 1: Basement and
pile cap excavation with cantilever CBP wall
Picture 2: Ground Instrumentation
Picture 3: Ground Instrumentation
(Click on images to see larger version)
Design of 2-level basement within MRT 1st reserve at
Wilkie Road
Picture 1: Installation
of soldier piles
Picture 2: Silent piler used for sheet pile
installation
Picture 3: Ground instrumentation daily monitoring
(Click on images to see larger version)
Design of 2-level basement within MRT 1st reserve at
Wilkie Road
Picture 1: N/A
Picture 2: N/A
Picture 3: N/A
(Click on images to see larger version)
Slope stabilization works using soil nails on a failed
slope at Clementi Road
Picture 1: Slope after stabilization
works
Picture 2: N/A
Picture 3: N/A
(Click on images to see larger version)
Construction of Kim Chuan Depot - Mass Rapid Transit
Circle Line Stage 2 Contract 821
Temporary removable ground anchored soldier p`ile wall
for 19m deep basement excavation.
Picture 1: N/A
Picture 2: N/A
Picture 3: N/A
(Click on images to see larger version)
19m deep excavation for East Tunnel with Real-Time remote
Monitoring System
Picture 1: Solar Powered
Remote Data Logger
Picture 2: N/A
(Click on images to see larger version)
LTA Contract C8230a - Temporary Retaining System for
Extension of Existing Siding Tunnel.
18m depth excavation 7 layer struts.
Picture 1: N/A
Picture 2: N/A
(Click on images to see larger version)
Newton Lift Church Extension - Top-down construction
with 2 level basement excavation within Railway Protection
ZOne